Kitchen And Bathroom Remodeling

Licensed, insured, and permit-pulled remodeling for Irvine homes and condos

Kitchen And Bathroom Remodeling Irvine CA Built To Code

Kitchen And Bathroom Remodeling Irvine CA means tearing out the old tile, fixing what the last remodel hid, and rebuilding with materials that hold up. We handle kitchen and bath remodel Irvine California projects from the first demolition swing to the final grout line, pulling permits through the City of Irvine and keeping your condo or single-family home livable while we work. If your kitchen is dated or your bathroom is leaking, call us for a free estimate.

Live phone supportUpfront optionsBacked workmanship
Call firstLive triage can help before arrival
Safety before speedRisks assessed before work begins
Diagnose the causeWe trace the source, not just the symptom
Approve the workScope and price explained upfront

What's included

What Our Kitchen And Bathroom Remodeling Includes

Every project is scoped in writing before demo. Here is what a standard kitchen and bath remodel covers, and where allowances let you control the finish budget.

01

Demo And Debris Haul-Away

We remove old cabinets, tile, fixtures, and drywall, protect the floors and stairs, and haul debris out daily. Dumpster and disposal fees are in the scope, not added later.

02

Plumbing And Electrical Rough-In

New supply and drain lines, shutoff valves, GFCI outlets, and dedicated circuits for appliances go in before the walls close. We pressure-test the lines and meet the inspector at rough-in.

03

Waterproofing And Tile

Shower pans get a pre-sloped membrane, walls get cement backer board, and every penetration is sealed before tile. We set porcelain or ceramic with the correct grout for wet areas.

04

Cabinets And Countertops

Cabinet install, leveling, and shimming come first, then countertop templating so the fit is tight. Quartz and granite are cut by a fabricator and set with the sink and faucet openings in place.

05

Fixtures, Paint, And Final Inspection

Faucets, toilets, shower trim, and lighting get installed and tested. We patch, sand, and paint, then walk the job with you and close the punch list before the final inspection.

Service overview

Kitchen And Bathroom Remodeling Irvine CA: What The Work Actually Involves

Kitchen And Bathroom Remodeling Irvine CA is general contracting work that removes and replaces the surfaces, fixtures, and systems in your kitchen and bathrooms, including countertops, cabinets, tile, grout, plumbing rough-in, and electrical. A real remodel starts behind the drywall: we cut out water damage, sister any soft framing, and run new supply and drain lines before a single tile goes down. On the kitchen side that means moving a gas line for a new range, adding circuits for a dishwasher, and setting a level countertop over cabinets that are actually square. In the bathroom it means a waterproofed shower pan, a properly sloped drain, and a fan that vents to the exterior, not the attic.

Most Irvine homeowners call us when the original builder-grade finishes hit their limit. The 1990s and early-2000s homes around Woodbridge and Westpark still have the original oak cabinets, cultured marble vanities, and 12-inch tile floors. Condos near the Spectrum and Irvine Business Complex add another layer: HOA rules, shared walls, and water shutoff coordination with neighbors. If you have been searching for Kitchen And Bathroom Remodeling Irvine CA near me and want a crew that reads the CC&Rs before demo day, we do that. We also handle affordable Kitchen And Bathroom Remodeling Irvine CA scopes where you keep the cabinet boxes and replace doors, counters, and fixtures instead of gutting the room.

Stop Hidden Water DamageA slow supply-line drip behind a vanity can rot the subfloor for years before you see a stain. We open the wall, replace the damaged plywood, and pressure-test the new lines. Catching it at the rough-in stage saves thousands compared to a full floor replacement later.
Permits That Pass InspectionIrvine requires permits for plumbing relocations, electrical changes, and structural work, and the inspection record follows the house. We pull the permit, meet the inspector, and hand you a signed-off job card. That paperwork matters when you sell.
Materials That Fit Irvine LivingPorcelain tile and quartz countertops handle daily traffic and humidity far better than the cultured marble and laminate they replace. We set tile over a properly prepped substrate with the right grout, so the floor does not tent or crack two summers later.
PeakStruct Group serving Irvine, California
How we workWe verify the cause, compare realistic options, and confirm the repair before we leave.

The service timeline

How Our Remodel Process Runs

The process flexes to the condition, but these checkpoints keep decisions clear.

01

Walkthrough And Scope

We walk the kitchen and baths with you, measure everything, and photograph the existing plumbing and electrical. You get a written scope with allowances for tile, countertops, and fixtures, so the number you approve is the number you see. This visit takes about 90 minutes.

Stage 1
02

Permits And Selections

We submit drawings to the City of Irvine and pull the permit, which usually takes two to four weeks. While that runs, you pick tile, grout, countertops, and fixtures with our supplier list. Locking selections before demo starts is what keeps a remodel on schedule.

Stage 2
03

Demo And Rough-In

Demo runs two to four days per room. We protect the floors and haul debris out daily. Then the plumber and electrician rough in new lines, and the inspector signs off before anything gets closed up. This is where we find the water damage and structural issues the last remodel left behind.

Stage 3
04

Build-Out And Finishes

Drywall, waterproofing, tile, cabinets, and countertops go in over the next three to five weeks. Our tile setter uses a laser level and a wet saw for clean cuts, and we set the shower pan with a pre-sloped membrane so water drains right. You get weekly updates and a walkthrough at each phase.

Stage 4
05

Final Inspection And Handoff

We schedule the final inspection, test every fixture and GFCI, and clean the site. You get the signed permit card, warranty paperwork, and a punch list closed out before we call the job done. Most Irvine kitchen and bath projects wrap in six to ten weeks total.

Stage 5

Tools & methods

Tools And Methods We Use

Purpose-built equipment, used by trained technicians, so the job is done accurately the first time.

01

Milwaukee And DeWalt Cordless Drills

Daily driving, anchoring, and cabinet install. Cordless keeps the site clean and lets us work in finished rooms without running cords.

02

Bosch Laser Level

Setting cabinet lines, tile rows, and shower pan slope. A laser keeps the grout lines straight across a long wall.

03

Wet Tile Saw And Tile Cutter

Clean cuts on porcelain and ceramic, including L-cuts around outlets and niches. Wet cutting controls dust and keeps the edge chip-free.

04

Reciprocating Saw And Sledgehammer

Demo of cabinets, tubs, and tile. Controlled demo protects the framing and plumbing we are keeping.

05

Drywall Lift

Hanging ceiling and upper-wall drywall safely with two people instead of four, which keeps the schedule tight.

06

Air Compressor And Nail Gun

Framing, trim, and cabinet install. Consistent fastener depth means trim sits flush and cabinets hang square.

Use cases

When Irvine Homeowners Call Us

These examples show how the service framework adapts rather than forcing every call through one repair.

Kitchen And Bathroom Remodeling
Woodbridge Kitchen Cabinet And Counter RefreshOriginal 1994 oak cabinets with worn doors, a laminate countertop peeling at the sink seam, and a slow leak that had rotted the cabinet base. The layout worked, but the finishes were done. → New cabinet doors and drawers on the existing boxes, quartz countertop with an undermount sink, new faucet and lighting, and the rotted base replaced. Finished in three weeks at roughly half the cost of a full gut.

Spectrum Condo Bathroom Shower Rebuild

A leaking shower pan that had stained the ceiling of the unit below, cultured marble walls, and a fan venting into the attic. The HOA required drawings before approval. → New pre-sloped shower pan with membrane, tiled walls and floor, a properly sized fan vented to the exterior, and a new vanity. HOA approved the drawings, and the inspection passed first time.

Northwood Two-Bathroom Phased Remodel

Both bathrooms original, one with soft subfloor around the tub and cracked grout throughout. The family could not go without a working shower during the project. → Soft plywood replaced, both bathrooms rebuilt with new tile, vanities, and fixtures, phased so one bathroom stayed usable the whole time. Six weeks total, both inspections signed off.

Problems we solve

Problems Our Irvine Remodels Solve

Most remodels start with a problem the homeowner has been living with for a while. These are the ones we see most often in Irvine kitchens and baths.

ISSUE

Water damage behind the vanity or under the sink

We open the wall, cut out the damaged plywood and drywall, treat for mold, and replace the supply and drain lines before rebuilding. The new substrate goes down over solid framing, so the tile has something to hold.

SYMPTOM

Permitting delays stalling the project

We submit drawings and pull the permit before demo, then schedule inspections at rough-in and final. You get the signed-off card, and the job record stays clean for resale.

SIGN

Budget overruns from vague quotes

Our written scope includes allowances for tile, countertops, and fixtures, plus a contingency line for hidden conditions. You approve the number before we start, and we price any surprise before doing the work.

ALERT

Poor workmanship on the last remodel

We tear out to the studs where needed, check the framing and slope, and rebuild with proper waterproofing and backer board. The tile gets set over a flat, sound substrate with the right grout, so it stays put.

Pricing process

What Remodeling Costs In Irvine

$15,000 - $110,000 depending on scope

Phase 01

Layout Changes

Moving a sink, range, or toilet means relocating supply and drain lines, which adds plumbing and inspection time. Keeping fixtures in place is the single biggest cost saver.

Phase 02

Cabinet Strategy

Refacing existing boxes costs far less than new cabinets. New cabinets add material and install time but let you change the layout and storage.

Phase 03

Countertop Material

Quartz and granite cost more than laminate but hold up better in a kitchen. Templating and fabrication are part of the price, and edge profile affects it too.

Questions before we arrive

Frequently Asked Questions

Kitchen And Bathroom Remodeling
Call (949) 236-6306
How much does Kitchen And Bathroom Remodeling cost in Irvine CA?

A typical Irvine kitchen remodel runs $28,000 to $75,000, and a bathroom runs $15,000 to $35,000 in 2026 pricing. A combined kitchen and bath project usually lands between $45,000 and $110,000. Cost depends on whether you keep the cabinet boxes, how much plumbing moves, and your tile and countertop selections. Condo projects can run higher because of HOA coordination and shared-wall work.

What does Kitchen And Bathroom Remodeling include in Irvine California?

A full scope includes demolition, haul-away, plumbing and electrical rough-in, drywall, waterproofing, tile, cabinets, countertops, fixtures, paint, and final inspection. We pull the permit and coordinate the City of Irvine inspector. Allowances cover tile, grout, countertops, and fixtures so you control the finish budget. Cabinet refacing and fixture-only swaps are smaller scopes we also quote.

Do I need permits for Kitchen And Bathroom Remodeling in Irvine CA?

Yes, if you move plumbing or gas lines, add or relocate electrical circuits, change a wall, or replace a shower pan. Irvine requires permits for those scopes, and the inspection record stays with the property. Cosmetic work like paint, tile over an existing sound substrate, and cabinet door swaps usually does not need one. We tell you which permits your job needs at the estimate.

How do I hire a kitchen and bath remodeler in Irvine CA?

Check the CSLB license, ask for the license number, and confirm the contractor carries insurance and workers comp. Get a written scope with allowances, not a lump-sum verbal quote. Ask who pulls the permit and who is on site daily. A licensed Kitchen And Bathroom Remodeling Irvine California contractor will answer all of that without hesitation, and we do.

Ready when you are

Get Your Kitchen And Bathroom Remodeling Irvine CA Estimate

We pull the permit, protect your floors, and finish the job with an inspection card in your hand. Call PeakStruct Group at (949) 236-6306 for a free estimate on your Irvine kitchen or bath. Licensed, insured, and local to Orange County.

Kitchen And Bathroom Remodeling

Talk with the local team

Request Kitchen And Bathroom Remodeling

Call (949) 236-6306 or email info@peakstructgroup.com to schedule your free estimate. We answer the phone Monday through Friday from 8:00 AM to 6:00 PM, and we return after-hours messages first thing the next morning. For emergencies, call any time and we will get back to you as soon as possible.

3750 Barranca Parkway, Irvine, CA 92606, United States, Irvine, CaliforniaMain office · technicians serve the full area

Thanks — your request is in. We will contact you shortly.

Call now